Efimov V.M., Rozhin I.I., Popenko F.E., Popenko F.E., Stepanov A.V., Stepanov A.A., Vasil'chuk Y.K. —
Arrangement of bored piles in the cryolithozone of central Yakutia
// Arctic and Antarctica. – 2018. – ¹ 1.
– P. 133 - 141.
DOI: 10.7256/2453-8922.2018.1.25936
URL: https://en.e-notabene.ru/arctic/article_25936.html
Read the article
Abstract: The article deals with the problems of arranging pile foundations on the territory of the Republic of Sakha (Yakutia) using bored piling. This technology, which is not so widespread in the republic, is simpler and more convenient, in contrast to reinforced concrete foundation piles. In the process of hardening concrete during the arrangement of the bored pile, local fission of frozen soil occurs. Therefore, when using bored piles in the cryolithozone, the problem of determining the design temperatures and the time of formation of the stationary soil regime at the base of the entire pile field, which allows full loading of the foundations, becomes especially critical. Field observations of the temperature regime of soils near the bored pile during its arrangement and hydration of concrete were carried out. In the course of the study, data was obtained on the dynamics of the temperature regime of the soil near the bored pile in the process of its arrangement. The data obtained show that stable negative temperatures over the entire depth of the well are observed one month after pouring, during which period the pile attains most of its strength.